Once the blocks were laid and the doors and windows were boxed out it was time for concrete...lots of it. Matt pumped 50 yds. into the walls. As Matt walked the perimeter pumping in the concrete the other guys helping out were watching for blow-outs, using rods to push the concrete down into the depths of the walls, checking to make sure things were level, etc. It was quite the process.




The hose used to pump the concrete into the walls.